Seattle's alternative 911 response program falls behind schedule

Österreich Nachrichten Nachrichten

Seattle's alternative 911 response program falls behind schedule
Österreich Neuesten Nachrichten,Österreich Schlagzeilen
  • 📰 axios
  • ⏱ Reading Time:
  • 24 sec. here
  • 2 min. at publisher
  • 📊 Quality Score:
  • News: 13%
  • Publisher: 63%

A Seattle program to develop alternative responses to 911 calls is months behind schedule — and some city council members are getting frustrated with the delay.

said the mayor's office would submit a plan for a pilot program by Dec. 22, and a framework for a permanent system of alternative 911 responses by Dec. 31.a meeting last week

"We need to make sure that we're driving this forward and creating some momentum where there currently appears to be very little," Herbold said. Housen said the proposed framework for a permanent alternative 911 response program is "currently in legal review," while the pilot program "is scheduled to launch later this year."Advancing this critical and innovative public safety work takes time to ensure it is done right," he said.

Wir haben diese Nachrichten zusammengefasst, damit Sie sie schnell lesen können. Wenn Sie sich für die Nachrichten interessieren, können Sie den vollständigen Text hier lesen. Weiterlesen:

axios /  🏆 302. in US

Österreich Neuesten Nachrichten, Österreich Schlagzeilen

Similar News:Sie können auch ähnliche Nachrichten wie diese lesen, die wir aus anderen Nachrichtenquellen gesammelt haben.

Man arrested after waving around gun in downtown SeattleMan arrested after waving around gun in downtown SeattleSeattle Police received multiple 911 calls about a man brandishing a handgun in downtown Seattle.
Weiterlesen »

2024 Porsche 911 Turbo S hybrid spy shots and video2024 Porsche 911 Turbo S hybrid spy shots and videoThe Porsche 911 is about to undergo its biggest change since the introduction of water-cooled engines.
Weiterlesen »

2023 Genesis Electrified G80, 2024 Porsche 911 Turbo S hybrid: Car News Headlines2023 Genesis Electrified G80, 2024 Porsche 911 Turbo S hybrid: Car News HeadlinesGenesis' Model S rival, Porsche's updated 911 Turbo, and GM's Ultra Cruise all made headlines today.
Weiterlesen »

Joe Mixon's Trainer Called 911 From NFL Star's Home, Reported Hearing Multiple GunshotsJoe Mixon's Trainer Called 911 From NFL Star's Home, Reported Hearing Multiple GunshotsJoe Mixon's trainer called 911 on Monday night from the NFL star's home to report hearing gunshots outside of the residence ... this according to new police audio, obtained by TMZ Sports.
Weiterlesen »

Joe Mixon’s trainer made 911 call from house after shootingJoe Mixon’s trainer made 911 call from house after shootingMixon’s trainer, Sean Pena, reportedly called 911 from the NFLer’s home and said “kids” were playing near the house and had blocked off the street with their cars.
Weiterlesen »

Former Head Of D.C. 911 Agency Sues Mayor Bowser, Alleging Whistleblower RetaliationFormer Head Of D.C. 911 Agency Sues Mayor Bowser, Alleging Whistleblower RetaliationCleo Subido, who led the Office of Unified Communications in 2021, alleges she was retaliated against for speaking up about dangerous errors within the 911 agency.
Weiterlesen »



Render Time: 2025-03-06 07:35:22