NASA will provide an update on Artemis 1. 🚀
Sep. 07, 2022, 6:49 p.m.
NASA would prefer to keep working work at Launch Pad 39B saying it allows the team “to gather as much data as possible to understand the cause of the issue.” Being at the pad also allows engineers to test the repair under super-cold conditions. NASA has stopped the countdown on two launch attempts for fueling problems. The next launch window opens Sept. 19 and closes Oct. 4. There are 14 launch opportunities in that period, but none on Sept. 29 and Sept. 30.
Österreich Neuesten Nachrichten, Österreich Schlagzeilen
Similar News:Sie können auch ähnliche Nachrichten wie diese lesen, die wir aus anderen Nachrichtenquellen gesammelt haben.
Here's why it's taking NASA so long to attempt another Artemis I launchNASA has a plan for repairs to the massive new moon rocket after its latest attempt to launch an uncrewed test mission. It will be at least a few weeks before the rocket can make its next attempt. Here's why.
Weiterlesen »
NASA to replace seal on leaky Artemis 1 moon rocket at the launch padIt's still unclear if the agency will roll the Artemis 1 stack off the pad before its next liftoff attempt.
Weiterlesen »
NASA picks spacesuit maker for 1st Artemis moonwalkersThe deal has a base value of $228.5 million.
Weiterlesen »
NASA will try to fix Artemis I rocket at pad, but still might roll back to VABNASA teams at Kennedy Space Center will try to fix the Artemis I moon rocket at the pad without rolling it back to VAB, potentially saving time and setting the stage for a third launch attempt no earlier than late September. NASA
Weiterlesen »
Artemis I: Space experts tell us why NASA's mission will make historyAstrophysicist Neil deGrasse Tyson, former NASA Deputy Aministrator Lori Garver, and others weigh in on NASA's historic Artemis mission.
Weiterlesen »
NASA spacecraft hopes to catch a solar flare as it zips past the sunBut don't worry, it's designed to handle the heat.
Weiterlesen »